Customer Success Stories
See how UK manufacturers are saving money, reducing downtime, and improving packaging quality with Alphabond adhesives.

Operator Safety, Sustainability & Profitability
Minor Weir & Willis
"Switching to Max 22 delivered measurable results—over 5 tonnes of CO₂ saved and 10 MWh energy reduction."
28% Consumption Savings & Thousands in Cost Reduction
Finlays
"When you look at the overall cost curve including energy savings and consumption, it's quite a surprise."
30–35% Reduction in Adhesive Use
Food Production Business
"We have no hesitation in recommending their products to other businesses operating similar labelling equipment."
Ten Years of Faultless Service
Food Ingredients Manufacturer
"I have no hesitation in recommending Alphabond to others. I'll be sticking with them for many years to come."
How Minor Weir & Willis Improved Safety, Sustainability & Profitability
Peter Musinsky, Packaging Buyer at Minor Weir & Willis, explains how switching to Max 22 with Alphabond delivered measurable operational improvements.
- Over 5 tonnes CO₂ saved
Plus 10 MWh energy reduction
- Faster setting times
Reduced adhesive usage and improved line performance
- Operator safety prioritised
Full technical support during changeover
How Manor Packaging Took Steps Towards Net Carbon Zero
Discover how Manor Packaging transformed their environmental impact by switching to bio-derived adhesives for their E-commerce Peel n Seal products.
- Bio-derived adhesives
More environmentally-friendly formulation
- E-commerce packaging
Peel n Seal products for sustainable shipping
- Net carbon zero journey
Taking meaningful steps towards sustainability
How Finlays Saved 28% on Adhesive Consumption & Thousands in Costs
John, Engineering Team Manager at Finlays, explains how switching to Alphabond delivered surprising cost savings despite a higher per-kilogram price.
- 28% consumption reduction
Across tea and coffee carton & tray lines
- Tank temperatures down to 98°C
From 165–175°C, eliminating charring and nozzle blockages
- Better carton bonding
Fewer pop-opens and customer complaints
How Tiger Tim Products Eliminated Nozzle Blockages & Reduced Downtime
Dameon Bedford, Production Manager at Tiger Tim Products, explains how switching to Alphabond dramatically reduced downtime across their 17-million-unit firelighter production.
- Dramatic downtime reduction
Blockages eliminated on Alphabond lines
- 17 million units annually
Reliable performance at scale
- Outstanding engineering support
Annual inspections, health checks & visual control points
257% Production Speed Increase
A well-known packaging company was running their folder gluer machines at 14,000 pieces per hour. After switching to PerfectaMax® 40, they achieved:
- 50KPieces per hour achieved
- 257%Speed increase
- GoodFibre tear maintained
"Line speeds were temporarily ramped up to 50,000 pieces per hour—still giving good fibre tear and without excessive tailing. That's an amazing 257% increase."