Dramatic Downtime Reduction & Blockage Elimination
How Tiger Tim Products, the UK's leading firelighter manufacturer, eliminated nozzle blockages and dramatically reduced downtime across their packaging lines.
The Challenge
Tiger Tim Products, the UK's leading manufacturer of firelighter products, were experiencing persistent nozzle blockages on their packaging lines. With 17 million units produced annually across multiple lines, even small amounts of downtime had a significant impact on output and costs.
The Solution
Alphabond carried out comprehensive trials, testing Tiger Tim's packaging materials in their laboratory and presenting the results before proceeding. Despite initial reservations, the trial results spoke for themselves. One production line that had been experiencing weekly problems with a competitor's adhesive was switched to Alphabond — and has had no issues since.
"We've had a dramatic decrease in downtime on the lines that use Alphabond. Line operators confirmed that any lines using Alphabond glue have hardly any blockages compared to the other lines running on competitors."
Results Achieved
- Dramatic decrease in downtime on Alphabond lines
- Nozzle blockages virtually eliminated
- No issues since changeover on switched lines
- Line operators confirmed significantly fewer blockages vs competitors
- Annual inspections and health checks provided by Alphabond
- Visual control points installed at production lines
- Engineering support readily available on-site
Tiger Tim Products
Want similar results?
Get Your Free AssessmentStruggling with Nozzle Blockages & Downtime?
Discover how the right adhesive can dramatically reduce downtime and eliminate blockages on your packaging lines.
Book a Free Consultation